The bridge was closed on June 25 to facilitate repair work by the by the NHAI’s concessionaire maintaining the section at an estimated cost of ₹10 crore
Source: The Hindu National (English)

The bridge was closed on June 25 to facilitate repair work by the by the NHAI’s concessionaire maintaining the section at an estimated cost of ₹10 crore
Source: The Hindu National (English)